C*Pix SDC2000 Instruções de Operação Página 18

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 366
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 17
SDC 2002
3. Operational Preparations
3-2
Operating Instructions - Rev. 1 / 6.2003
3.2. POWER-UP
The film scanner is powered up with the mains switch ”Power” at the front of the film
scanner (Fig. 301: 1).
To switch on the Graphical Control Panel GCP1 ( Fig. 301: 2), press the power
button 3.
To avoid EMC (electromagnetic compatibility) problems keep the rear doors
always closed during operation!
After 15 minutes operating time, all characteristics are stabilized.
1
Film Scanner SDC 2002
Diagnostics PC
3
SDC 2002 Thomson
Spirit
DataCine
2
11
2
Graphical Control Panel
Fig. 301: Film scanner SDC 2002
Warm-up
Vista de página 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 365 366

Comentários a estes Manuais

Sem comentários